Volume 8, Issue 16 (2-2018)                   jwmr 2018, 8(16): 213-222 | Back to browse issues page


XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

(2018). Estimation of Maximum Possible 24-Hour Precipitation Using Local spatial Variations in Southern Kohgiluyeh-e-Boyerahmad Watersheds. jwmr. 8(16), 213-222. doi:10.29252/jwmr.8.16.213
URL: http://jwmr.sanru.ac.ir/article-1-917-en.html
Abstract:   (3509 Views)
To design water constructs, such as spillways, canals and many other water structures one needs to estimate probable maximum precipitation (PMP). Since climate variability and spatial variations affect PMP estimation selection of proper statistical method, which provides better estimation is important. Based on general frequency equation, Hirschfield method has been proposed for this purpose, but it overestimation makes it unfavourable. Therefore, the aim of this research is to estimate PMP24 of Kohgiluyeh-e-Boyerahmad region using frequency factor. The PMP trend was calculated using long term meteorological data. Data of 3 out of 31 stations showed trends, which were omitted from further processing The simulated statistics of the 28 selected stations shows that the 3-factor log-normal is the best model to fit the data. The homogeneity factor (H1) is -1.61, which shows a slight non-homogeneity in the region. Therefore, the biggest frequency coefficient could be used to estimate PMP24 in all stations, which were 4.45. Using these criteria the calculated PMP of all stations were used to draw isohyet and reveal special rainfall distribution.
Full-Text [PDF 2774 kb]   (2134 Downloads)    
Type of Study: Research | Subject: Special
Received: 2018/01/30 | Revised: 2018/02/26 | Accepted: 2018/01/30 | Published: 2018/01/30

References
1. Casas, M. C., R. Rodrıguez., R. Nieto and A. Redano. 2008. The estimation of probable maximum precipitation the case of Catalonia, trends and directions in climate research. Annals of the New York Academy of Sciences, 1146: 291-302. [DOI:10.1196/annals.1446.003]
2. Chow, V. T., D.R. Maidment and L.W. Mays. 1988. Applied Hydrology. McGraw-Hill, New York, U.S.A.
3. Daniela, R., S. Zbynek and K. Vit. 2005. Estimation of probable maximum precipitation over the catchments in the Czech Republic. Atmospheric Research, 77: 707-721.
4. Desa, M.A.B and P.R. Rakhecha. 2007. Probable maximum precipitation for 24-hr duration over an equatorial region: part 2-Johor, Malaysin. Atmospheric Research. 84: 84-90. [DOI:10.1016/j.atmosres.2006.06.005]
5. Desa, M.M.N., A.B. Noriah and P.R. Rakhecha. 2001. Probable maximum precipitation for 24-hr duration over Southeast Asian monsoon region-selangor, Malaysin. Atmospheric Research, 58:41-54. [DOI:10.1016/S0169-8095(01)00070-9]
6. Fattahi, E., A. M. Noorian and K. Noohi. 2011. Comparison of physical and statistical methods for estimating probable maximum precipitation in southwestern basins of Iran. Desert, 15: 127-132.
7. Ghahraman, B. 2008. The estimation of one day duration probable precipitation over Atrak watershed in Iran. Journal of Scienes & Technology, 32: 175-179.
8. Hartkamp, A.D., K.D.N. Stein and J.W. White. 1999. Interpolation Technique's for climate Variables Res. Rep. NRG-GIS Series 99-01. Mexico, D.F.: CIMMYT.
9. Hershfield, D.M. 1965. Method for estimating probable maximum Percipitation. J. Am. Water Works Assoc, 57: 965-972. [DOI:10.1002/j.1551-8833.1965.tb01486.x]
10. Hosking, J.R.M. 1994. The Four-Parameter Kappa distribution. IBM Journal of Research and Development, 38: 251-258. [DOI:10.1147/rd.383.0251]
11. Hosking, J.R.M. and J.R. Wallis. 1997. Regional on L-Moments Cambridge University Press, New York, USA.
12. Hutchinson, M.F. 1991. The application of thin plate smoothing splines to continent-wide data assimilation. Melbourne: Bureau of Meteorology. In: Data Assimilation Systems, edited by J. D. Jasper, BMRC Research Report, 27: 104-113.
13. Khalaji Pirbalouty, M. and A. Sepaskhah. 2002. Estimating and Mapping 24-h Probable Maximum Precipitation by Statistical Methods as Compared to Synoptic Method for Iran. JWSS - Isfahan University of Technology, 6(1): 1-11 (In Persian).
14. Noori Gheidari, M.H. and A.R. Telvari. 2015. Estimating the Probable Maximum Precipitation in the Bakhtiari Dam Basin Using the Statistical and Synoptical Methods. Journal of Civil Engineering, 27(1): 189-198.
15. Rosner, B. 1975. On the detection of many outliers. Techno metrics, 17: 221-227. [DOI:10.2307/1268354]
16. Shafiei, M. and B. Ghahraman. 2009. Spatial distribution of Probable maximum precipitation for 24 h duration over Ghareh Ghum watershed. Iranian Journal of irrigation and drainage, 2(3): 50-59 (In Persian).
17. Soleimani Sardou, F., A. Salagegh., M. Sanjari and A. Azare. 2015. Application of linear moment methods for Hershfild method (case study Halilrud watershed). Journal of Range and Watershed Management, 68(1): 95-108.
18. Tajbakhsh, M. and B. Ghahraman. 2009. Estimation of 24-h probable maximum precipitation by using different statistical approaches for north-east of Iran. Journal of Water and Soil Conservation, 16(1): 123-141 (In Persian).
19. Torke Herchgani, M. 2014. Statistical estimation of 24-h probable maximum precipitation using correction of Hirschfild coefficient (cace study for Chaharmahal and Bakhtyari Province). Journal of Meteorological Organization, 38(85): 11-16.
20. World Metrological organization Estimates of maximum floods. 1969. WMO tech Note, No. 98, 208 pp.

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Journal of Watershed Management Research

Designed & Developed by : Yektaweb